BUILD TEAM

The Build Team works at a hangar located at Willard Airport in Savoy, IL. The build session usually occurs during weekends, when students drive to the airport (extra traveling spots are usually available for students without vehicles). Should there be any special arrangements, prior notices will be given out via the communication measures available. Secondary meeting spots include but not limited to Talbot Laboratory and Optical Physics and Engineering Laboratory (OPEL).

COMPOSITES

There is currently not a formal location to work on the Composites plane, but we are working on getting another hangar to store larger parts and temperature-sensitive materials.

hangar